PRODUCT PARAMETERS

7000 Liters Water Truck ISUZU

project Descriptions Specifications
Basic Overall dimensions(mm) 7370*2250*2700
curb weight(Kg) 4755
Loading capacity(Kg) 5600
Total mass(Kg) 10550
Body Tank volume (m³) 7
Tank material Q235/carbon steel
Tank thickness(mm) 4
Water pump model 65QZ40/50N(S)
Chassis

 

Chassis brand Isuzu
Driver form 4*2
Steering wheel Left hand drive
Engine brand and model 4KK1N6HD
Engine emission standard Euro 6
Fuel type Diesel
Gearbox 6-speed gearbox

VEHICLE ADVANTAGES

CUSTOMIZABLE TANK SIZE

MAIN STRUCTURE OF THE TANK

1.Tank Construction: The tank body is made of high-quality carbon steel orstainless steel, formed in a single roll forming process, and then welded toprevent leaks.
2. Ladder: This ladder allows you to reach the top of the tank.
3. Filling Port: This filling port allows you to observe the contents of the tankand add water.
4. Measuring Tube: This tube allows you to check the amount of liquid insidethe tank.

STANDARD CONFIGURATION

1. Four-way three-way valve: Open it when adding water. When the handleis parallel to the pipeline, it is open; when it is perpendicular, it is closed.
2. Water inlet: lt can be used to draw water from a nearby outdoor watersource and can also be used as a gravity drain outlet.
3.Hose connection: Connect an external hose for pressurized drainage andcan also be used for water intake.
4. Large-diameter ball valve: Increase the water flow in the pipeline.
5. Front water spraying device: Used for sprinkling water on the road toreduce dust.
6. Rear water spraying device: The operation angle can be adjusted asneeded.
7. Side water spraying device: The water mist sprayed by the nozzle has alarge and dispersed area.
8. High-pressure water spraying device: lt can be adjusted into various spraymodes, such as columnar, rain-like and mist-like.
9. High-position sprinkler: The high-position sprinkler can provide a moreuniform spray and a wider coverage area.

DISPLAY OF WORKING STATUS

1. Universal front -flushing (device)
2.Fan -shaped rear -sprinkling(device)
3. Side -spraying (device)
4.Rear -mounted high – pressure water gun
5. High – position sprinkler

PRODUCTIONPROCESS

1.Preparation of tank materials
2.Tank materials enter the equipment
3.Tank rolling completed
4.Tank capping treatment
5.Tank anti -rust paint treatment
6.Chassis and pipeline assembly
7.Tank and chassis assembly
8.Vehicle assembly completed

APPLICATION SCENARIOS

PACKAGING AND TRANSPORTATION

After-sales and service

We provide lifelong tracking service and one year free warranty for all of our products. Meanwhile we provide free training and technical support to guide you repair your product. If need, we will also send original spare parts free of charge by air.

Delivery Time

We do our best to ensure that orders are ready for dispatch within 24 working days (after payment is received)

Delivery areas

Whether you are in a bustling city or a quiet island, our global logistics network can seamlessly reach any sovereign country and region in the world.

Get A Quote

Inquiry Now